Print Print    Close Close

NASA targets April 1 launch for first crewed moon mission since Apollo

By Michael Sinkewicz

Published March 12, 2026

Fox News
NASA targets April 1 for Artemis II lunar flight launch Video

NASA is targeting an April 1 launch for its Artemis II mission around the moon, marking the first crewed lunar flight since Apollo in 1972.

Officials said Thursday they completed a flight readiness review (FRR) and are set to roll the rocket back to the pad March 19 followed by final configuration for launch.

A potential launch for the 10-day mission is scheduled for 6:24 p.m. ET April 1, with a backup date of April 2 at 7:22 p.m.

"At the conclusion of the FRR, all the teams polled go to launch and fly Artemis II around the moon, pending completion of some of the work before we roll out to the launch pad," Lori Glaze, acting associate administrator for the Exploration Systems Development Mission Directorate, said at a news conference at Kennedy Space Center in Florida.

NASA BEGINS INFRASTRUCTURE OVERHAUL UNDER ISAACMAN AS TRUMP PUSHES AMBITIOUS SPACE EXPLORATION GOALS

NASA's Artemis II mission rocket and spacecraft inside facility

NASA's Artemis II sits in the Vehicle Assembly Building at NASA’s Kennedy Space Center Jan. 16, 2026, in Cape Canaveral, Fla. (Joe Raedle/Getty Images)

"It's a test flight, and it is not without risk, but our team and our hardware are ready," Glaze added.

Artemis II had been scheduled to launch in early February, but the mission was delayed after fuel leaks were discovered during a test run. A helium leak was later identified at the end of the month. The Space Launch System (SLS) rocket was transferred from the launchpad back to the Vehicle Assembly Building (VAB) for repairs that are nearly complete.

John Honeycutt, chair of the Artemis II Mission Management Team, said the mission’s success odds range from one in two to one in 50 when asked about the risks of Artemis II.

TRUMP RENOMINATES MUSK ALLY JARED ISAACMAN TO LEAD NASA AFTER EARLIER REVERSAL

NASA Artemis II Crew

The crew of NASA’s Artemis II mission (left to right): NASA astronauts Christina Hammock Koch, Reid Wiseman (seated), Victor Glover and Canadian Space Agency astronaut Jeremy Hansen. (NASA)

Honeycutt later said he does not want the mission’s success viewed as a 50-50 proposition.

"If you look at the data over time, over the lifespan of building new rockets, right, the data would show you that one out of two is successful. You’re only successful 50% of the time," Honeycutt said. "I think we’re in a much better position than that.

"I don’t want people to take that as being that we should be scared to go fly because we’re not scared to go fly," he added. "We do an outstanding job of understanding the risk, buying down the risk, mitigating the risk and putting together controls to manage the risk."

SENATE CONFIRMS JARED ISAACMAN AS NASA CHIEF MONTHS AFTER TRUMP-MUSK RIFT THAT MAY HAVE PULLED HIS NOMINATION

Lori Glaze, acting associate administrator, Exploration Systems Development Mission Directorate looks on as John Honeycutt, the Artemis II Mission Management Team chair

Lori Glaze, acting associate administrator for NASA’s Exploration Systems Development Mission Directorate, and Artemis II Mission Management Team Chair John Honeycutt addressed reporters during a news conference at Kennedy Space Center. (Gregg Newton/AFP via Getty Images)

NASA also said it will not conduct another "wet dress rehearsal," a prelaunch fueling test for Artemis II.

"When we tank the vehicle the very next time, I would like it to be on a day that we could actually launch. I would like to do it on launch day," Glaze said. "And if we are able to successfully fully tank the vehicle, I want to be able to go to launch."

She added that NASA does not want to use up any days in its April launch window for a wet dress rehearsal.

NASA LIKELY TO DELAY ARTEMIS II MOON MISSION LAUNCH AGAIN DUE TO HELIUM FLOW PROBLEM

NASA targets April 1 launch for Artemis II crewed moon mission Video

The Artemis program was first established by President Donald Trump during his first term in December 2017.

The four astronauts involved in Artemis II — Americans Reid Wiseman, Victor Glover and Christina Koch and Canadian Jeremy Hansen — are expected to orbit the moon before returning home in what would be the farthest human spaceflight ever.

CLICK HERE TO DOWNLOAD THE FOX NEWS APP

NASA has said Artemis III, Artemis IV and Artemis V are expected to launch before the end of Trump’s current term, with Artemis IV and V aiming to return astronauts to the moon's surface. 

Fox News Digital's Preston Mizell and Brie Stimson contributed to this report.

Michael Sinkewicz is a writer for Fox News Digital. Story tips can be sent to michael.sinkewicz@fox.com

Print Print    Close Close

URL

https://www.foxnews.com/us/nasa-targets-april-1-launch-first-crewed-moon-mission-apollo

  • Home
  • Video
  • Politics
  • U.S.
  • Opinion
  • Entertainment
  • Tech
  • Science
  • Health
  • Travel
  • Lifestyle
  • World
  • Sports
  • Weather
  • Privacy
  • Terms

This material may not be published, broadcast, rewritten, or redistributed. © FOX News Network, LLC. All rights reserved. Quotes displayed in real-time or delayed by at least 15 minutes. Market data provided by Factset. Powered and implemented by FactSet Digital Solutions. Legal Statement. Mutual Fund and ETF data provided by LSEG. Do Not Sell my Personal Information - New Terms of Use - FAQ